Project 34- Approved proposal of Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)

    (1) Name of Project Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)- DDA
    (2) Name of the Agency DDA
    (3) UTTPEC Processing

    The proposal was discussed in 46thGoverning Body meeting of the UTTIPEC was held on 21.02.2014 under the Chairmanship of theHon’ble L.G.of Delhi in which the Governing Body approvedthe proposal“Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)- DDA”

    Decision:
    As recommended by Working Group II-A, the Governing Body approved the proposalwith all the following observations/ recommendations of WG-IIA.

    Observations / Recommendation of Working Group II-A:
    1. The gradient of the flyover is to be kept gentle (preferably 1:50) for smooth access, ascent and movement of cycles and other NMT modes on the flyover/ROB.
    2. Separate lanes on both sides of the carriageway are to be provided for smooth and safe movement of cycle/ NMT modes.
    3. Provision of ramps/stairs along with the future requirement of lift/elevators should also be made in the detail construction drawings for universal accessibility.

    Working Group recommended the proposal for consideration of the Governing Body with all the above observations and modifications.

    Decision:
    As recommended by Working Group II-A, the Governing Body approved the proposalwith all the above observations/

    recommendations.
    (4) Copy of approved plan Click here
    (5) File No. F5(47)2013/UTTIPEC
    (6) Date of uploading of website 06.08.2015
    (7) Additional Details Project Manager (MPR)