Project 45 for Corridor Development Plan of Mangal Pandey Marg

    1. Name of Project Road Development Plan and Street Network / Connectivity Plan for the corridor / influence zone of Mangal Pandey Marg from foot of the Signature Bridge to U.P. Border (Bhopura)
    2. Name of the Agency PWD, GNCTD
    3. Consultant AEI International, SGI Consulting Pvt. Ltd., Delhi.
    4. Copy of the approved plan

    Short Term Proposal(At Grade Solution):

    Layout Plan-1Layout Plan-2Layout Plan-3

    Long Term Proposal:

    Key PlanLayout Plan-1Layout Plan-2,Layout Plan-3Layout Plan-4Layout Plan-5Layout Plan-6.

    5. UTTPEC Processing
    The project of PWD was considered by UTTIPEC 56th Working Group II-B in its meeting dt. 16.05.2016 and the proposal was recommended for consideration & approval by the 53rd  UTTIPEC Governing Body  dated 23.11.2016 with the following decisions/observations :- 
     
    Observations:
     
    PWD mentioned the minor impediments on the proposed alignment of corridor, which shall not be hindrance during the construction of proposed alignment of this road.
     
    Decision:
     
    Based on the above observations, this proposal was approved.
    6. Date of Uploading the project 02.03.2017
    7. Additional Details

    Executive Engineer
    Flyover Project Division, F-11,
    PWD, GNCTD,
    Opposite Indraprastha Park,
    Sarai Kale Khan,
    Ring Road,
    Delhi-110013 Email id-  eepwddelhif121@gmail.com