Project 41- Approved proposal of Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Borde

    (1) Name of Project Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)
    (2) Name of the Agency DDA
    (3) UTTPEC Processing

    The proposal was discussed in 51stGoverning Body meeting of the UTTIPEC was held on 29.05.2015 under the Chairmanship of theHon’ble L.G.of Delhi in which the Governing Body approvedthe proposal“Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)”

    Decision:
    After detailed deliberation, following decisions were taken:

    1. The consultants for DDA will carry out detailed studies for justification of alignment taking into consideration the design speed and same will bepresentedagain in the next Governing Body meeting.
    2. A joint site visit shall be conducted by Chief Engineer (Projects), DDA, Delhi Traffic Police,PWD and consultant (DIMTS).
    3. The simulation study is to beconducted by the Consultants.
    4. The road which has already been built from UER-II is to be taken up for further construction upto UER-I from already build road portion.
    (4) Copy of approved plan Click here
    (5) File No. F5(46)2013/UTTIPEC
    (6) Date of uploading of website 06.08.2015
    (7) Additional Details Project Manager (Flyover), DDA
    17thFloor, Vikas Minar
    New Delhi-110002
    Ph. No.: 23370660
    Email ID : pmflyover2@yahoo.com