Project No. 57- Construction of 2nd Bridge onYamuna River near KalindiKunj/ Traffic Circulation Plan on SaritaVihar side upto proposed Kalindi By-pass (6-Lane Yamunabridge near KalindiKunj Noida)

    1.        

    Name of Project

    Construction of 2nd Bridge onYamuna River near KalindiKunj/ Traffic Circulation Plan on SaritaVihar side upto proposed Kalindi By-pass (6-Lane Yamuna bridge near KalindiKunj Noida)

    2.        

    Name of the Agency

    New Okhla Industrial Development Authority (NOIDA)

    3.        

    Consultant

    HOLTEC CONSULTING PRIVATE LIMITED

    4.        

    Copy of Proposal /Presentation

    Click Here

    5.        

    UTTPEC Processing

    The project was discussed in the 58th UTTIPEC Governing Body (G.B.) meeting was held on 14.12.2018 under the Chairmanship of the Hon’ble L.G. of Delhi. The observations & decisions of Governing Body meeting are as follows:

    Observations

      i)        NOIDA submitted the proposal of 2nd Bridge along with following proposed traffic interventions without necessary consultation with PWD (GNCTD), DMRC, NHAI, land owning agency, etc.

    a) Connectivity to proposed Kalindi bye-pass with the provision of 3 lanes each signal free elevated road for vehicular traffic movement from Noida to proposed Kalindi by-pass and vice versa.

    b) Rotary near Jaitpur village for movement of traffic from Jaitpur village to Metro station (KalindiKunj) and toward Noida /SaritaVihar.

    c) Widening of existing road connecting 2nd bridge and Road No. 13A.

     ii)        Sr. Manager (WC-2), NOIDA clarified that NOIDA is not able to develop the above mentioned proposed traffic interventions due to inter-state administrative and financial issues. Sr. Manager (WC-2), NOIDA further mentioned that the proposed Kalindi by-pass has been taken over by NHAI for development.

    Decision                                                                                                                       

    The Governing Body of UTTIPEC has given post facto approval of the stretch of corridor and its linkages with the existing surrounding roads falling within the boundary of NCT of Delhi.

    Further, Governing Body directed PWD to prepare a comprehensive proposal incorporating the interventions as mentioned at para 3.1 (i) in consultation with NHAI, NOIDA-authority, I&FC-GNCTD and road owning agency and submit in UTTIPEC for consideration of Working Group/ Governing Body.

    6.

    Date of Uploading the project

     25.03.2019

     

    7.        

    Additional Details

    Senior Manager,

    Work Circle-II, Water Works Compound,

    Sec-19, Noida, Gautam Buddha Nagar,

    Uttar Pradesh - 201301