Project No. 59- Elevated Corridor from Chilla Regulator (Delhi) to MP-03 road along Shahdara drain/ 6- Lane Elevated Corridor over Shahdara drain between Mayur Vihar Flyover (near Chilla Regulator) and Mahamaya Flyover in Noida

    1.        

    Name of Project

    Elevated Corridor from Chilla Regulator (Delhi) to MP-03 road along Shahdara drain/ 6- Lane Elevated Corridor over Shahdara drain between Mayur Vihar Flyover (near Chilla Regulator) and Mahamaya Flyover in Noida

    2.        

    Name of the Agency

    NOIDA Authority

    3.        

    Consultant

    Dhruv Consultancy Services Ltd.

    4.        

    Copy of Proposal /Presentation

    Plan

    5.        

    UTTPEC Processing

    The project was discussed in the 58th Governing Body Meeting dated 14.12.2018 under the Chairmanship of the Hon’ble L.G. of Delhi. The observations & decisions of Governing Body meeting are as follows:

    Observations of the Governing Body:

      i)   i)  PWD raised query that which agency will bear the cost of 2 lanes widening of road from drop down arm of elevated corridor near Mayur Vihar flyover till Barapullah Phase-III and its maintenance.  GM, Noida informed that the cost will be borne by Noida / UP Government.  On maintenance issue, Noida will have a meeting with PWD (GNCTD) in this regard.

    Decision   of the Governing Body :              

         The Governing Body of UTTIPEC approves only the stretch of proposed elevated corridor and its linkages with existing Delhi-Noida Link Road falling within the boundary of NCT of Delhi.

    6.

    Date of Uploading the project

     04.10.2019

     

    7.        

    Additional Details

    Sh. S.C. Gupta

    Sr. Manager (WC-2)

    Noida Authority

    Water Works Compound, Sector-19, Noida

    Phone No.- 0120-2440047, 9205691148

    Email id- pewc2noida@gmail.com