Project No. 64 Corridor Development and street Network/ Connectivity Plan for the influence zone of the corridor between Punjabi Bagh Flyover and Raja Garden Flyover

    1

    Name of the Project

    Corridor Development and street Network/ Connectivity Plan for the influence zone of the corridor between Punjabi Bagh Flyover and Raja Garden Flyover

    [File No. F7(9)/11/UTTIPEC/Vol.I]

    2

    Name of the Agency

    Public Works Department, Govt. of Delhi

    3

    Consultant

    Feedback Infra Private Limited

    4

    Copy of Proposal

    Proposal Part-1,Proposal Part-2, Proposal Part-3

    5

    UTTIPEC Processing

    The project was discussed in the 61stUTTIPEC Governing Body (G.B.) meeting held on 24.12.2020 under the Chairmanship of the Hon’ble L.G. of Delhi. The observations & decisions of Governing Body meeting are as follows:

     

    Observations

    1. Traffic Police mentioned about the provision of a loop for signal-freemovement between Ring Road and Main Patel road. PWD informedthat the above was already presented to the Working Group and wasnot found acceptable.
    2. Traffic Police informed that there is a need to provide parking space forthe Punjabi Bagh cremation ground. They also mentioned that there isan existing CNG station creating congestion on the Ring Road. PWDshould consider it to reduce the congestion through designinterventions.
    3. PWD was directed to give due care of pedestrians by provision ofadequate footpath width.

     

    Decision

    Based on the above observation, the proposal was approved with thecondition to incorporate the provisions for adequate space for safe movementof pedestrian/ addressing the issue of walkability on this stretch.

    6

    Date of uploading the Project

    16.03.2021

    7

    Additional Details

    Rajesh Kumar Gupta

    Executive Engineer

    Flyover Project Division, F-11

    PWD, Govt. of Delhi

    MukarbaChowk, New Delhi 110033

    Ph.: 011-27691180

    E-mail: eepwddelhif11@gmail.com