DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Project 13- ITO : Urban Renewal
»  Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers
»  Pedestrian Design Guidelines
»  UTTIPEC Street Design Checklist
»  Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
»  New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
»  New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
»  New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
»  New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
»  New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Traffic Advisory
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Functions of Traffic & Transportation Centre

a)    To compile a manual based on hand books/best practices/Traffic Transportation Planning & Engineering norms for uniform adoption in NCT Delhi.

b)    To digitize the available Traffic & Transportation plans.

c)    To develop a comprehensive integrated programme for traffic & transportation projects.

d)    To coordinate integrated development of traffic & transportation projects including Integrated Freight Complex (IFC), Metropolitan Passenger Terminal (MPT), Inter-State Bus Terminal (ISBT) by involving concerned local bodies.

e)    To coordinate refurbishment of urban corridors for capacity augmentation with focus on small improvements and retrofitting measures that synergize into zero defect roads and relieving traffic congestion.

f)    All transportation projects/transport Engineering solutions in Delhi by any agency having road Engineering/Infrastructure implication would require clearance of the centre. This would ensure that latest technology and research finding support is available to all new roads & projects.

g)   The Technical support of staff and secretarial assistance to this centre shall be provided by the Authority.

 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved