DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Project 13- ITO : Urban Renewal
»  Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers
»  Pedestrian Design Guidelines
»  UTTIPEC Street Design Checklist
»  Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
»  New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
»  New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
»  New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
»  New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
»  New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Traffic Advisory
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Projects Approved by UTTIPEC

Project 1- Proposal of Link Road connecting Press Enclave road with Outer Ring Road

Project 2- Improvement of circulation around newly constructed Rotary at domestic Airport Road & Approach Road connecting Dwarka

Project 3- Corridor improvement plan of Rani Jhansi Road with a two level Grade Separator from Filmistan Cinema to Boulevard Road

Project 4- Traffic Management Plan on Roads Leading to and around New Delhi Railway Station and Civic Centre, Building at New Delhi

Project 5- Proposal for comprehensive development of corridor (Outer Ring Road) between Mangolpuri to Madhuban Chowk

Project 6- Proposal for comprehensive development of corridor (Outer Ring Road) between Madhuban Chowk to Mukarba Chowk

Project 7- Interim part extended plan of the fly over (under construction) on RTR – ORR intersection between Pashchimi Marg / Sangam Marg, intersection upto almost Vasent Marg intersection

Project 8- Elevated Corridor over Barapullah Nallah

Project 9- Proposal for Comprehensive Development of Corridor (on Ring Road) between Azadpur to Prembari Pul

Project 10-Transportation & Circulation Plan for Redevelopment of ISBT at Anand Vihar

Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk

Project 12-Proposal for comprehensive development of corridor (Outer Ring Road) between Vikas Puri to Meera Bagh

Project 13- ITO : Urban Renewal

Project-14-Transportation & Circulation Plan for Re-development of ISBT at Sarai Kale Khan

Project 15-Construction of RUB at level crossing adjacent to Roshnara Garden

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved