DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 34- Approved proposal of Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)

(1)

Name of Project

Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)- DDA

(2)

Name of the Agency

DDA

(3)

UTTPEC Processing

The proposal was discussed in 46th  Governing Body meeting of the UTTIPEC was held on 21.02.2014 under the Chairmanship of the Hon’ble L.G. of Delhi in which the Governing Body approved the proposal Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)- DDA

 

Decision:

As recommended by Working Group II-A, the Governing Body approved the proposal with all the following observations/ recommendations of WG-IIA.

 

Observations / Recommendation of Working Group II-A:

                      i.        The gradient of the flyover is to be kept gentle (preferably 1:50) for smooth access, ascent and movement of cycles and other NMT modes on the flyover/ROB.

                     ii.        Separate lanes on both sides of the carriageway are to be provided for smooth and safe movement of cycle/ NMT modes.

                    iii.        Provision of ramps/stairs along with the future requirement of lift/elevators should also be made in the detail construction drawings for universal accessibility.

Working Group recommended the proposal for consideration of the Governing Body with all the above observations and modifications.

Decision:

            As recommended by Working Group II-A, the Governing Body approved the proposal with all the above observations/ recommendations.

(4)

Copy of approved plan

Click here 

(5)

File No.

F5(47)2013/UTTIPEC

(6)

Date of uploading of website

06.08.2015 

(7)

Additional Details

Project Manager (MPR)

Near GTK Bus Depot,

Mukarba Chowk, G.T. Karnal Road,

Delhi-110033

Ph. No : 27691057

Mob : 9810369687 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved