DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 36- Approved proposal of Barapullah Phase-II Project with redevelopment of Kidwai Nagar (East) Project- Improvement of alternative routes /secondary network for Barapullah Phase-II corridor

(1)

Name of Project

Barapullah Phase-II Project with redevelopment of Kidwai Nagar (East) Project- Improvement of alternative routes /secondary network for Barapullah Phase-II corridor PWD & NBCC

 

(2)

Name of the Agency

PWD

 

(3)

UTTPEC Processing

The proposal was discussed in 47th  Governing Body meeting of the UTTIPEC was held on 25.06.2014 under the Chairmanship of the Hon’ble  Lt. L.G. of Delhi in which the Governing Body approved the proposal Barapullah Phase-II Project with redevelopment of Kidwai Nagar (East) Project- Improvement of alternative routes /secondary network for Barapullah Phase-II corridor PWD & NBCC

 

Decision of Governing Body:

            As recommended by the Working Group, the Option-4 was approved by the Governing Body along with provision of access to the NBCC/ MOUD project and integration of the Metro subway and implementation of the Multi-modal Integration Plans developed by UTTIPEC with following:

               i)        A new link road along the Barapullah drain connecting East Kidwai Nagar to Tyagaraja Stadium and onwards to Aurobindo Marg.

             ii)        A U-turn at grade on the Barapullah Phase 2 road where it touches the Aurobindo Marg to provide link from East Kidwai Nagar to Tyagaraja Stadium side.

            iii)        The Loop connecting Ring Road to the Barapullah Elevated corridor Phase II for facilitating traffic from Dhaula Kuan side to enter Barapullah Phase II elevated road near Aurobindo Marg.

 

(4)

Copy of approved plan

 

Click here

  

(5)

File No.

 

F1(63)2012/UTTIPEC

 

(6)

Date of uploading of website

 

06.08.2015 

 

(7)

Additional Details

Chief Engineer (F-1)

PWD, Flyover Project Zone F-1

12th floor, Police Head Quarter

I.P. Estate, New Delhi-110002

Ph NO. :- 23724077,23317926

Email.ID:- f1@pwddelhi.com 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved