DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 41- Approved proposal of Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)

(1)

Name of Project

Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)

 

(2)

Name of the Agency

DDA

 

(3)

UTTPEC Processing

The proposal was discussed in 51st  Governing Body meeting of the UTTIPEC was held on 29.05.2015 under the Chairmanship of the Hon’ble L.G. of Delhi in which the Governing Body approved the proposal Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)

 

Decision  :

            After detailed deliberation, following decisions were taken:

                      i)        The consultants for DDA will carry out detailed studies for justification of alignment taking into consideration the design speed and same will be  presented  again in the next Governing Body meeting.

                     ii)        A joint site visit shall be conducted by Chief Engineer (Projects), DDA, Delhi Traffic Police,  PWD and consultant (DIMTS).

                    iii)         The simulation study is to be  conducted by the Consultants.

                   iv)        The road which has already been built from UER-II is to be taken up for further construction upto UER-I from already build road portion.

 

(4)

Copy of approved plan

 

Click here 

 

(5)

File No.

F5(46)2013/UTTIPEC

 

(6)

Date of uploading of website

06.08.2015

(7)

Additional Details

Project Manager (Flyover), DDA

17th Floor, Vikas Minar

New Delhi-110002

Ph. No.: 23370660

Email ID : pmflyover2@yahoo.com 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved