DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project- 43 Integrated Transit Corridor Development and Street Network / Connectivity Plan for the corridor / influence zone – Nizammudin to Badarpur Border Section (Ashram Underpass).

 

Name of Project

Integrated Transit Corridor Development and Street Network / Connectivity Plan for the corridor / influence zone – Nizammudin to Badarpur Border Section (Ashram Underpass).

 

Name of the Agency

PWD (Govt. of NCT Delhi)

 

UTTPEC Processing

Project was presented by PWD, GNCTD in Working Group- II B meeting dated 10.08.2015 under Pr. Secretary, PWD and in Governing Body meeting under Hon’ble LG Delhi on13.01.16. The recommendations and decision of these meetings are as follows:

 

Recommendation of 53rd Working Group –IIB dated 10.08.2015:

i)     Working Group recommended construction of   Underpass at Ashram Chowk along Mathura  Road with all parameters as per Street Design  Guidelines such as NMV lanes, pedestrian  footpaths, service lane etc. immediately.

ii)    Other alternative options mentioned at  observation (ii) above need to be expedited for  implementation.

iii)   It was decided that both the options i.e. at  grade, underpass & flyover will be uploaded on  UTTIPEC website for community feedback.

 

 Decision of the 52nd Governing Body dated 13.01.2016:

 

The Governing Body approved the proposal for  underpass at Ashram intersection along Mathura Road  with all other prescribed parameters as per Street Design  Guidelines such as NMV lanes, pedestrian footpaths,  service lane etc.

 

Copy of approved  plan

Click here

 

 

File No.

F.6(187)2012/UTTIPEC

 

 

Date of uploading on  website

08.07.2016

 

 

Additional Details

Executive Engineer

Flyover Project Division, F-31, PWD

Opposite Gate No. 6 of JLN Stadium,

New Delhi-110003

Email id-  eepwddelhif31@gmail.com

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved