DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 45 for Corridor Development Plan of Mangal Pandey Marg

1.        

Name of Project

Road Development Plan and Street Network / Connectivity Plan for the corridor / influence zone of Mangal Pandey Marg from foot of the Signature Bridge to U.P. Border (Bhopura)

2.        

Name of the Agency

PWD, GNCTD

3.        

Consultant

AEI International, SGI Consulting Pvt. Ltd., Delhi.

4.        

UTTPEC Processing

The project of PWD was considered by UTTIPEC 56th Working Group II-B in its meeting dt. 16.05.2016 and the proposal was recommended for consideration & approval by the 53rd  UTTIPEC Governing Body  dated 23.11.2016 with the following decisions/observations :- 

 

Observations:

 

      PWD mentioned the minor impediments on the proposed alignment of corridor, which shall not be hindrance during the construction of proposed alignment of this road.

 

Decision:

 

         Based on the above observations, this proposal was approved.

5.        

Copy of the approved plan

Short Term Proposal(At Grade Solution):

Layout Plan-1, Layout Plan-2, Layout Plan-3

 

Long Term Proposal:

Key Plan, Layout Plan-1, Layout Plan-2, Layout Plan-3, Layout Plan-4, Layout Plan-5, Layout Plan-6.

6.        

Date of Uploading the project

 

02.03.2017

 

8.        

Additional Details

Executive Engineer,

Flyover Project Division, F-11,

PWD, GNCTD,

Opposite Indraprastha Park,

Sarai Kale Khan,

Ring Road,

Delhi-110013

Email id – eepwddelhif121@gmail.com  

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved