DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project-49: Integrated Transit Corridor Development and Street Network / Connectivity Plan. Sh.-Old Yamuna Bridge to Delhi-UP Border (Apsara Border) and flyover at Shastri Park Junction on GT Road.

1.        

Name of Project

Integrated Transit Corridor Development and Street Network / Connectivity Plan. Sh.-Old Yamuna Bridge to Delhi-UP Border (Apsara Border) and flyover at Shastri Park Junction on GT Road.

2.        

Name of the Agency

PWD

3.        

Consultant

Urban Transport Division, RITES Ltd.

4.        

Copy of Proposal /Presentation

Proposal of Seelampur Junction

Proposal of Sahstri Park Junction

Proposal of Old Yamuna Bridge and Ansari Road

Proposal of Shamshan Ghat-Gandhi Nagar Junction Section

5.        

UTTPEC Processing

The project was discussed in UTTIPEC Working Group-II-B meeting under the Chairmanship of Secretary, PWD on 08.03.2017.  The background, project, details, observations, recommendations of Working Group-II-B meeting are as follows:

 

Observations

 

i)      Seelampur ’T’ point should be improved  by providing smooth left turn from G.T. road to Jaffrabad Road and from Jaffarabad Road to GT road (towards Shahdara side).

 

ii)     It was noted that the loop will tend to expand capacity for motorized transport.  However, a proper system of signaling & signages will be essential.  The PWD & Traffic Police will make suitable provision for signal phasing & signages to ensure optimum utilization of loops and smooth flow of the traffic .

 

iii)    PWD will widen the Marginal Bund road from Shastri Park junction to proposed loop to cater the expected traffic volume.

 

iv)   The widening of the existing underpass crossing GT road near Shastri Park intersection to be done.  PWD had already provided the same by widening it by 3 mt in their proposal/drawings.

 

v)    Two ’U’ turns below the proposed Seelampur flyover, on    G.T. Road should be proposed with standard clear height to decongest the T junction below the Seelampur ’T’ point. 

 

vi)   PWD, GNCTD will integrate the other proposal from Shastri Park intersection upto Khajuri Khas intersection incorporating the proposed cross section and other details at Shastri Park - G.T. Road junction.

 

Recommendation

 

Based on the above observations, Working Group recommended the proposal for uploading on UTTIPEC website for community feedback and accordingly, for consideration of the Governing Body.

 

Observations of The 54th Governing Body dated 22.06.2017:

The proposal includes a Multilevel Parking at Gandhi Nagar, Governing Body agreed with the proposed parking facilities, with the condition that PWD, GNCTD to explore alternative options to avoid concrete structure as construction of concrete Multilevel Parking will take longer time and difficult to dismantle in case of failure to serve the purpose or underutilized. PWD agreed for construction of multilevel parking using steel structure.

 Traffic engineering solutions to be introduced

 

 Decision of The 54th Governing Body dated 22.06.2017:

In view of the above observations, the proposal was approved by the Governing Body.

6.

Date of Uploading the project

 20.11.2017

 

7.        

Additional Details

Executive Engineer

ITPO Project Division,

PWD, GNCTD

Bhairon MargT-Junction,

Near Pragati Power Station,

Ring Road,

New Delhi-110002, Tel: 011-23378558

Email id- eeitpo@gmail.com

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved