DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Project 13- ITO : Urban Renewal
»  Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers
»  Pedestrian Design Guidelines
»  UTTIPEC Street Design Checklist
»  Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
»  New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
»  New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
»  New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
»  New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
»  New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Traffic Advisory
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 8- Removal of Mother Dairy Booth, DMS Booth and two transformers on Bhishma Pitamah Marg

 1

Name of the Project

Removal of Mother Dairy Booth, DMS Booth and two transformers on Bhishma Pitamah Marg

2

Name of the Agency

 

Municipal Corporation of Delhi (MCD)

3

Project Schedule

 

Shifting of Mother Dairy Booth

A new site in lieu of the existing Mother Dairy Booth on B.P.Marg has been handed over to the Mother Dairy Officials on 05.03.2009.  As promised by Mother Dairy officials, the shifting shall be completed by 31.05.2009 as the same involves construction of permanent booth and establishment of machinery and cooling plant.

Shifting of DMS Milk Booth

The new site in lieu of the existing DMS booth has been handed over to DMS on 16.03.2009 and the same has been already shifted. 

Removal/Shifting of 2 transformers

As per the estimate submitted by BSES and approved by ETC, payment amounting to Rs.1,50,90,184/- has been made to BSES on 20.03.2009.  The utility shifting was to be carried out by BSES immediately.  The issue has been pursued with the concerned BSES officials vide this office letters dated 02.04.2009 and 16.04.2009.  This has also been discussed at the level of EE/SE/CE, MCD with their BSES counterparts.  BSES yet to start shifting work.

 

4

UTTIPEC Processing

 

UTTIPEC in its meeting held on 20.02.2009 directed to take necessary action as above.

 

5

Copy of the before and after photos 

 

 

 

For Additional Details

 

Sh. Feroz Ahmed

Chief Engineer-VII

Municipal Corporation of Delhi

Ambedkar Stadium

New Delhi

Phone/Fax – 011-23311523

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved