DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Project 13- ITO : Urban Renewal
»  Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers
»  Pedestrian Design Guidelines
»  UTTIPEC Street Design Checklist
»  Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
»  New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
»  New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
»  New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
»  New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
»  New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Traffic Advisory
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 2- Improvement of circulation around newly constructed Rotary at domestic Airport Road & Approach Road connecting Dwarka

1

Name of the Project

Improvement of circulation around newly constructed Rotary at domestic Airport Road & Approach Road connecting Dwarka

2

Name of the Agency

Delhi Development Authority (DDA)

3

Consultants

M/s Tandon Consultants Pvt. Ltd., 17, Link Road, Jangpura Ext., New Delhi – 110014
Ph. – 24317684, 24310509

4

Project Scheduled

Tenders invited

  • Pre-bid meeting held on 15.01.09
  • Tenders received on 28.01.09
  • Work to be started by March, 2009
  • Work likely to be completed by June, 2010

5

UTTIPEC Processing

The project of DDA was considered by UTTIPEC Working Group II-B in its meeting held on 10.12.2008. The Working Group recommended the project of an underpass at the rotary of domestic Airport Approach Road connecting Dwarka with following observations:

      i.           The final phase of the project beyond Commonwealth Games to be also worked out subsequently showing segregated movement of private, public and NMT & also interlinking bus stops with pedestrian movements.

 

     ii.         All engineering aspects/road geometry (slope/gradient, curves, weaving length, pedestrian movement etc.) and other statutory clearances to be ensured by DDA Engineering wing as per the norms.

UTTIPEC Governing Body under the Chairmanship of Hon'ble L.G, Delhi accorded its approval in principle, based on the observation/recommendation of the Working Group.

6

Location Map

 

7

Copy of the approved plan

 

8

Issue under process

18,574 sqm of defence land is yet to be taken over from defence by DDA Engineering wing.

9

For additional details

Project Manager (Flyover) Group II,
DDA, 17th Floor, Vikas Minar, New Delhi.
Ph – 23370660
                           &
Executive Engineer, Flyover Division No.1, DDA, Kirti Nagar, Lakkar Mandi, New Delhi.