DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 25- Approved proposal of Improvement of corridor Development Plan of Mehrauli Mahipalpur Road from Andheria Mor to Mahipalpur (Phase-I i.e. from Andheria Mor to Aruna Asaf Ali Marg).

(1)

Name of Project

Improvement of Corridor Development Plan of Mehrauli Mahipalpur Road from Andheria Mor to Mahipalpur (Phase-I i.e. from Andheria Mor to Aruna Asaf Ali Marg).

 

(2)

Name of the Agency

PWD (Govt. of NCT of Delhi)

 

(3)

UTTPEC Processing

Proposal - Governing Body dated 28.02.2012 approved the proposal for Phase I for final implementation and approved in principle the broad conceptual alignment proposal as per observations of the Working Group with the condition that the detailed plan of entire BRT / ITC corridor prepared by DIMTS to be followed for implementation by PWD after obtaining necessary approval from UTTIPEC and other agencies. 

Governing body  dated 25.06.2014 under the Chairmanship of Hon’ble LG, Delhi approved the  Stage-III final drawings of Phase-I proposal i.e. from Andheria Mor to junction of Aruna Asaf Ali Road on Mehrauli Mahipal pur Road.

 

(4)

Copy of approved plan

Click here

Segment-I

Segment-II 

Segment-III 

Segment-IV

 

(5)

File No.

F.6(34)09/UTTIPEC/Vol-IV

(6)

Date of uploading of website

 12.12.2014

(7)

Additional Details

Sh. Diwakar Aggarwal, Superintending Engineer, M-11, PWD, 13th Floor, MSO Building, I.P. Estate, New Delhi: 110002.      Email id- m21@pwddelhi.com

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved