Project- 55Two lane Bund Road connecting Bijwasan – Najafgarh Road (UER-I) to Northern Peripheral Road (Haryana Border).

    1 Name of Project Two lane Bund Road connecting Bijwasan – Najafgarh Road (UER-I) to Northern Peripheral Road (Haryana Border)
     
    2 Name of the Agency

    Project Manager (Flyovers), DDA,

    3 UTTPEC Processing

    Background & Proposal   

    • Project was presented by Chief Engineer (Projects) in 10th meeting of Task Force on “Decongestion of Delhi” under Addl. Secretary, UD on 6.6.2016. Task Force decided that UTIPEC will Reexamine the proposal in view of the public interest.
    • The project road is a two lane road of 1.1km length and width of 20m to 30m along embankment of Bijwasan lane. This road connects UER-1 to Northern Peripheral Road (NPR) along Bijwasan road by Irrigation & Flood Control Deptt., GNCTD. The alignment is straight except one location where there is a sharp curve which is unavoidable as this connectivity is on the existing bund road and needs upgradation on 'as and when wherein basis'.
    • In 50th Governing Body meeting under the chairmanship of Hon'ble L.G. Delhi on 29.05.15, the proposal of “Alignment of 80M R/W road from the boundary of NCT of Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Border)” was discussed in which four options were presented by Chief Engineer (Projects)DDA. In option no.1, a 1014 m long & 80m wide corridor was proposed by widening the existing bund road connecting UER-I and Northern Peripheral Road upto Haryana Border.

    Observations:

    • It was observed that this road should meant for Light Motor Vehicles (LMVs) only, such as cars, two wheelers etc.
    • Proper traffic safety audit shall be done in planning, during construction and during running of traffic.
    • Proposal to be submitted as per UTTPEC format for submission, which is available on UTTIPEC website i.e. www.uttipec.nic.in.

    Recommendation of 36thWorking Group –IIA dated 15.06.2016:
    Based on the above observations, Working Group in principle approved the proposal subject to Safety audit and observations as above.

    4 Copy of approved plan Click here
    5 File No. F.1(221)2016/UTTIPEC
    6 Date of Uploading the project

    13.07.2016

    7 Last date of Feedback

    11.08.2016

    8 Additional Details


    Project Manager (Flyovers), DDA, 17th Floor, VikasMinar, New Delhi-110002
    Email id- pmflyover2@yahoo.com Post Opinion (For General Users)

     

Post Opinion (For General Users)