DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Project 13- ITO : Urban Renewal
»  Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers
»  Pedestrian Design Guidelines
»  UTTIPEC Street Design Checklist
»  Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
»  New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
»  New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
»  New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
»  New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
»  New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Traffic Advisory
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


SiteMap

» About UTTIPEC
°

Aims and Objectives

°

Functions of Traffic & Transportation Centre

°

UTTIPEC Governing Body

°

UTTIPEC Executive Committee

°

Working Groups

° Gazette Notification
*

Gazette Notification dated 31.07.2008

*

Gazette Notification dated 07.08.2009

°

Directory

» Guidelines
° Approved Guidelines
*

Guideline for Road Marking

*

Pedestrian Design Guidelines

*

Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers

*

UTTIPEC Street Design Checklist

*

MRTS Connectivity and Multimodal Integration Checklist

°

Draft Guidelines

» Projects
° Projects for Seeking Community Feedback
New Project 1 for Approval - North South corridor connecting Gandhi Nagar to Shastri Park along Marginal Bund Road
New Project 2 for Approval - Construction of 7 entry Gates on National Highways and State Highways
New Project 3 for Approval - Traffic problems of South Delhi (Greater Kailash – I and II)- Additional entry or exit point to Greater Kailash part – II and adjoining colonies
New Project 4 for Approval - Re-development of ISBT at Anand Vihar
New Project 5 for Approval - Re-development of ISBT at Sarai Kale Khan
New Project 6 for Approval - Care of 3 Nos. additional clover leaves at Sarita Vihar Flyover i.c slip road or approach road, Bridge, footpath, cycle track and underpass (RUB) to connect Road No. 13 A to Road No.13.
New Project 7 for Approval - Proposed RUB at level crossing near Roshanara Garden/ Gulabi Bagh
New Project 8 for Approval - Road Development plan from Mehrauli-Mahipalpur to NH-8
New Project 9 for Approval - Comprehensive Integrated corridor improvement plan of Road No – 56 from Gazipur to Apsara Border
New Project 10 for Approval - Road over Najafgarh drain from Wazirabad to Meera Bagh
New Project 11 for Aproval-Traffic decongestion plan for C-Hexagon, India Gate
New Project 12 for Approval-Alignment option for Northern Access Road Additional entry/exit for Indira Gandhi International Airport
New Project 13 for Approval-Construction of Grade Separator/ Underpass at the intersection of Shankar Road and Upper Ridge Road in Karol Bagh Zone
New Project 14 for Approval-Proposal for integration of Shahanjanabad with New Delhi and retrofitting of roads of Chandni Chowk and concept of feeder transport network
New Project 15 for Approval-Traffic Management and Heritage Conservation Plan for Karol Bagh Zone
New Project 16 for Approval-Proposal for integration of Shahanjanabad with New Delhi and retrofitting of roads around MCD Civic centre
New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin
New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone
New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road
New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.
New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.
° Minor Road Improvement Works Executed
*

Project 1- Widening of slip road beneath Ashram Flyover

*

Project 2- Construction of U– Turn beneath Sarai Kale Khan Flyover

*

Project 3- Proposal for solving traffic problem at Kalindi Kunj Border

*

Project 4- Widening of Maharani Bagh Road – Ring Road in ‘Y’ shape

*

Project 5- Closing of cut on August Kranti Marg

*

Project 6- Modification on Press Enclave Road

*

Project 7- Provision of Rumblers and Zebra Crossing on Press Enclave Road

*

Project 8- Removal of Mother Dairy Booth, DMS Booth and two transformers on Bhishma Pitamah Marg

*

Project 9- Closing of crossing at T point on Major Sudesh Marg

*

Project 10- Traffic engineering proposal regarding extension of central verge at More Rajori Garden

*

Project 11- Modification of Vasant Vihar Road

*

Project 12- Shortening of central verge at Ashoka Niketan on road No.58A

° Projects Approved by UTTIPEC
*

Project 1- Proposal of Link Road connecting Press Enclave road with Outer Ring Road

*

Project 2- Improvement of circulation around newly constructed Rotary at domestic Airport Road & Approach Road connecting Dwarka

*

Project 3- Corridor improvement plan of Rani Jhansi Road with a two level Grade Separator from Filmistan Cinema to Boulevard Road

*

Project 4- Traffic Management Plan on Roads Leading to and around New Delhi Railway Station and Civic Centre, Building at New Delhi

*

Project 5- Proposal for comprehensive development of corridor (Outer Ring Road) between Mangolpuri to Madhuban Chowk

*

Project 6- Proposal for comprehensive development of corridor (Outer Ring Road) between Madhuban Chowk to Mukarba Chowk

*

Project 7- Interim part extended plan of the fly over (under construction) on RTR – ORR intersection between Pashchimi Marg / Sangam Marg, intersection upto almost Vasent Marg intersection

*

Project 8- Elevated Corridor over Barapullah Nallah

*

Project 9- Proposal for Comprehensive Development of Corridor (on Ring Road) between Azadpur to Prembari Pul

*

Project 10-Transportation & Circulation Plan for Redevelopment of ISBT at Anand Vihar

*

Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk

*

Project 12-Proposal for comprehensive development of corridor (Outer Ring Road) between Vikas Puri to Meera Bagh

*

Project 13- ITO : Urban Renewal

*

Project-14-Transportation & Circulation Plan for Re-development of ISBT at Sarai Kale Khan

*

Project 15-Construction of RUB at level crossing adjacent to Roshnara Garden

» ATR on Suggestions
°

ATR on complaints through AAUI

°

ATR on suggestions from Public

» Public Notice
» Articles
» Related Agencies
» Download (Suggestion Form Only)
» Helpline
» Contact Us
» Hot Links
°

Format for Proposal Submission

°

Guideline for Road Marking

°

Project 13- ITO : Urban Renewal

°

Guidelines and Specifications for Crash Barriers, Pedestrian Railings and Dividers

°

Pedestrian Design Guidelines

°

UTTIPEC Street Design Checklist

°

Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk

°

New Project 17 for Approval - Proposal of closure of cut at Mathura road, opposite Nizamuddin

°

New Project 18 for Approval- Construction of RUB at Railway Crossing connecting Rama Road and Prem Nagar in Karol Bagh Zone

°

New Project 19 for Approval- Widening of Mehrauli Mahipalpur Road from Andheriya Mod to T-Junction with Aruna Asaf Ali Road

°

New Project 20 for Approval- Construction of Grade Separator at the Intersection of Pusa Road/Dr.K.S. Krishanan Marg and Patel Road in Karol Bagh.

°

New Project 21 for Approval- Proposed Underpass for Multilevel Under Ground Fully Automatic Car Parking Complex for High Court of Delhi.

°

Transit Oriented Development (TOD)

» Terms & Conditions
» Disclaimer
» Privacy Policy
» News Flash
°

Traffic Advisory

°

Crackdown on illegal parking

°

Grand plan: Integrate all transport in Delhi, NCR

°

Gazette Notification dated 07.08.2009

» Press Clipping
°

Paving The Way

°

In 3 months, Ahmedabad BRT a winner

°

Barapullah Road to act as alternative to Ring Road

°

Avoid India Gate during Hockey WC

°

UTTIPEC Advertisement (English and Hindi)

°

Google and Delhi Metro join hands

°

Grand plan: Integrate all transport in Delhi, NCR

°

Crackdown on illegal parking

°

Traffic Advisory

°

Drive for Pedestrain Friendly roads loses way

°

Grounded by traffic at flyover central

°

Making space for more legroom

» Format for Proposal Submission
Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved